Friday, 25 January 2013

Day of Shooting for 'ABANDONED'

As planned, set out to film on the 30th December, in a muddy and cold woods.
Due to the group being familiar with the woods we were able to have a rough idea in the area in which we would shoot the river scenes. We knew that, depending on the weather, there may have been little-or no water to film but luckily, it had rained several days before we were due to shoot and therefore there was a substantial amount of water. Although we thought that there would be this water, we still brought along several bottles of water in case it needed enhancing, thankfully we didn't need to do this and instead we used the water to clean our muddy shoes after the day's filming.
    We managed to roughly follow our storyboard and film many different shots of the river, we filmed more shots than we knew we needed as we wanted to prevent the chance of needing to re-shoot, this therefore would leave us enough time to edit.

After filming in the woods, we headed back to our second location on nightfall, to film the burning of the doll's house and photo's. We encountered problems with the filming of this as it was windy outside and the doll's house refused to light but after a sprinkling of white spirit, the house lit and gave us the result we wanted.

Overall, it was a successful day of filming.









Production Plan for Abandoned



Monday, 14 January 2013

Title Credits Research


Order of the credits
Production Company presents
"Title"
Lead Cast
Supporting Cast
Casting Director
Music Composer
Costume Designer
Associate Producers
Editors
Production Designer
Director of Photography
Producer
Writers
Director

We have decided to only use the ones in bold, as we feel it would not be right to use all of them due to the length of our title sequence.
We also think that we may use the title at the end of the sequence as this is not uncommon. Hammer films is our chosen production company as they mainly create horror films, therefore this company would be most suited.

Hammer Films

Building the dolls house



Building the dolls house took us around Five lessons to complete, however this was okay as we had anticipated that it would take a while to complete. We wanted to make sure that the dolls house would be complete by the time we broke up for the December half term as this was when we decided we wanted to shoot for our title sequence.

We have currently found a few audio tracks that we like and are currently debating what one would fit best with our title sequence, so we will wait until we have shot and edited footage before we think of the music any further.
We are also looking at font's to use, and so far we have found none but we have decided to have the font red as red is a typical colour in horror.